Thanks to the help of several volunteers on Saturday, the carpark has now been re-surfaced with 29 tonnes of gravel. As you can see, spirits were high during the work! (click on each image for a larger version)

image2 20170204 103719 resized 20170204 103721 resized

 

The house re-wiring project is also going well, all downstairs lights are now working and the upstairs lights are wired - ready for connection. All other wiring is in place, we have decided to install double-pole isolation switches on all room circuits which will allow us to fully isolate each room. 

20170128 161145 resized consumer unit